After installing the filter boxes and elbows shown in my previous post, it is now time to fabricate the next set of duct and transitions that will run up the wall. There are three total units and each will need a 90" drop. Below are the in-progress fittings lined up in a pretty little row.
Our next task is to cut and install the Ductmate Flange System on each section of duct for easy installation when we get to the jobsite.
Wolla!
We finished up a few 90 elbows with turning vanes for the job as well. Probably could have managed a better photo but I had to assist my helper uncle with that tub of screws :)...JK