SaraSpa Rod & Gun Club Duct Fabrication

After installing the filter boxes and elbows shown in my previous post, it is now time to fabricate the next set of duct and transitions that will run up the wall. There are three total units and each will need a 90" drop. Below are the in-progress fittings lined up in a pretty little row.

image.jpg

Our next task is to cut and install the Ductmate Flange System on each section of duct for easy installation when we get to the jobsite.

Wolla!

image.jpg

We finished up a few 90 elbows with turning vanes for the job as well. Probably could have managed a better photo but I had to assist my helper uncle with that tub of screws :)...JK

 

SaraSpa Rod & Gun Club Duct Installation Photos

Here are a couple pics from our most recent duct installation at the SaraSpa Rod and Gun Club in Greenfield Center, NY.

Installation of the Exit Air Unit ductwork and filter cabinet.

Installation of the Exit Air Unit ductwork and filter cabinet.

Installation of Make-up Air Unit duct.

Installation of Make-up Air Unit duct.

The job has been progressing nicely with a lot of custom duct and fittings. Each section is fabricated with 24 gauge metal and secured together with the Ductmate Flanging System.

There is a light at the end of the tunnel regarding finishing up the installtion and fabrication. I hope to get all the photos gathered together and share them after the project is completed. With our move to a new fabrication shop space and other jobs, time has been at a premium. We are finally getting back to a somewhat normal schedule.